The new Shelby Grade School building which was constructed at a cost of $30,000 in 1905 and was opened around January 1. The name change to Shelby High School came about in 1927-1928 when only grades 8 to 10 remained.
Scroll to zoom • Drag to pan • Double-click to zoom in